VDOT's construction is underway on a new roundabout at the intersection of Wards Ferry Road, CVCC Campus Drive, and Harvard Street. The project is designed to improve traffic flow and safety for drivers and pedestrians in the area.
Construction is expected to be complete towards the end of 2027. CVCC will remain open throughout the project. Students, employees, and visitors should allow additional travel time and check this page for updates before traveling to campus.
Current Construction Update
VDOT's latest construction schedule, covering October 19–30, 2026, includes continued embankment fill along Wards Ferry Road and Campus Drive, as well as storm sewer pipe installation along Campus Drive.
October 19–23: Crews will continue embankment fill and storm sewer installation. A water line connection along Campus Drive was scheduled for October 20.
October 26–30: Work will continue on storm sewer pipe installation along Campus Drive and embankment fill along both Wards Ferry Road and Campus Drive.
Drivers should expect delays on Wards Ferry Road and Campus Drive due to periodic lane closures throughout both weeks. Flaggers will be used to direct traffic safely through active work zones.
Whenever possible, use the U.S. 29 Business/Wards Road entrance to access campus. Drivers are encouraged to allow extra travel time, use caution near construction areas, and follow directions from traffic-control personnel.
Additional construction updates will be posted as new schedules become available.
Traffic Patterns
Traffic patterns near the Wards Ferry Road entrance may change throughout construction. Drivers should:
- Follow all posted signs and directions from traffic-control personnel
- Reduce speed when traveling through the construction area
- Allot additional time when traveling to campus
- Use an alternate route when recommended
CVCC will share advance notice of significant lane closures, detours, or entrance restrictions.
Campus Access
CVCC will remain accessible throughout construction. The campus can be accessed from:
- Wards Ferry Road entrance
- US 29 Business/Wards Road entrance
Drivers are encouraged to use the U.S. 29 Business/Wards Road entrance whenever possible during active construction.
Parking
Campus parking lots will remain open and accessible during construction. Some parking areas or access routes may be temporarily affected as construction progresses. Any parking changes will be communicated in advance and posted on this page.
VDOT Project Information
VDOT is managing the construction project and is the official source for project schedules and construction details.
Stay Informed
CVCC will provide updates if the construction affects campus access, traffic patterns, parking, or pedestrian routes.
Updates will be shared through:
- This webpage
- Student and employee email
- CVCC social media
- Campus alerts when immediate action is necessary
For questions or concerns about campus access, parking, or traffic patterns at CVCC, please email facilities@centralvirginia.edu.